Hot Sale Spray Booth / Paint Booth / Baking Oven
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Jiangsu
-
Validity to:
Long-term effective
-
Last update:
2017-11-29 13:26
-
Browse the number:
60
Company Profile
Jiangsu Jingzhongjing Industry Coating Equipment Co., Ltd.By certification [File Integrity]
Contact:Miss nicole(Mr.)
Email:
Telephone:
Phone:
Area:Jiangsu
Address:Jiangsu
Product Details
1. Paint booth Introduction:
Automobile paint spraying/baking booth is used for air purification during auto paint coating operation and drying operation after painting spray. Paint spraying and drying are performed in the same booth. This paint spraying/baking booth is typical of paint spraying and baking functions, provided with automatic thermostat paint spraying, ventilation, air purification, paint mist treatment, and winter hot-air supply functions during paint spraying, and automatic heating, thermostat timing, and timed shutdown function during paint baking. The equipment is reliable in running, simple for operation, and easy for maintenance. The equipment of this paint spraying/baking booth is composed of booth structure system, illumination System, air supply system, circulation system, air purification system, paint mist treatment system, pressure control devices, and electrical control system, etc.
2. Technical Parameters:
1. Outside dimension (L x W x H) mm: 7000*5350*3450
2. Inside dimensions (L x W x H) mm: 6900*4000*2650
3. Large Door Size (W x H) mm: 3000×2600
4. Capacity of Blower fan: 25000m3/h
5. Capacity of exhausted fan: 25000 m3/h
6. Inside air speed: m/s:0.3
7. Air exchange volume time/h:280
8 Top temperature: 80ºC
9. Heating time(20ºC-80ºC)/min:5-6
10. Lighting volume: 1000LUX
11. Noisy: ≤80dB
12. TSP: mg/m3:≤1.4
13. gas consumption:8-10m3/h
14. Power:17kW
3. Specification:
Production Photos:
Automobile paint spraying/baking booth is used for air purification during auto paint coating operation and drying operation after painting spray. Paint spraying and drying are performed in the same booth. This paint spraying/baking booth is typical of paint spraying and baking functions, provided with automatic thermostat paint spraying, ventilation, air purification, paint mist treatment, and winter hot-air supply functions during paint spraying, and automatic heating, thermostat timing, and timed shutdown function during paint baking. The equipment is reliable in running, simple for operation, and easy for maintenance. The equipment of this paint spraying/baking booth is composed of booth structure system, illumination System, air supply system, circulation system, air purification system, paint mist treatment system, pressure control devices, and electrical control system, etc.
2. Technical Parameters:
1. Outside dimension (L x W x H) mm: 7000*5350*3450
2. Inside dimensions (L x W x H) mm: 6900*4000*2650
3. Large Door Size (W x H) mm: 3000×2600
4. Capacity of Blower fan: 25000m3/h
5. Capacity of exhausted fan: 25000 m3/h
6. Inside air speed: m/s:0.3
7. Air exchange volume time/h:280
8 Top temperature: 80ºC
9. Heating time(20ºC-80ºC)/min:5-6
10. Lighting volume: 1000LUX
11. Noisy: ≤80dB
12. TSP: mg/m3:≤1.4
13. gas consumption:8-10m3/h
14. Power:17kW
3. Specification:
Outside Dimension (mm) | 7006 * 5656 * 3450(L*W*H) | Inside Dimension(mm) | 6900 * 4000 * 2650(L*W*H) |
Front Door(mm) | 3000*2600(W*H) | Service door (mm) | 1800*650(W*H) |
Total Power | 17KW | ||
Cabin system | Wall panel | 50mm rock-wool panel, double face steel sheet thickness: 0.6mm | |
Ceiling panel | Galvanized steel sheet. | ||
Basement | 300mm depth, middle with grids, two side with checkered plates. | ||
Ramp | three 2000*900mm ramps | ||
Glass | 6mm safety tempered glass | ||
Windows | Square glass Windows | ||
Air Make-up System | Air Inlet fan system | 1 * 7.5kw turbo fan, proof-explosion motor, Ex rated | |
Exhausted fan system | 1 * 7.5kw turbo fan, proof-explosion motor, Ex rated | ||
Ai capacity | 25000m3/h | ||
Air Flowing speed | 0.3m/s in empty booth | ||
Air Control method | One manual damper for air inlet and exhausted system | ||
Exhausted ducting | 8 meters air duct, one flop damper and one weather hood | ||
Purification System | Pre-filter | G3 grade, Pockets | |
Ceiling filter | EU5 / F5 | ||
Floor filter | green fiber glass filter / G3 grade | ||
Exhausted fan Filters | Pocket filter or M green fiber glass filter. | ||
Heating System | Heat Exchanger | SUS304 material, argon arc welding. | |
Heating burner: | Riello G20 diesel oil burner(gas burner for option) | ||
Heating productivity | 180000Kcal/h | ||
Spray to baking switch | 20N BELIMO brand electrical damper | ||
Chimney ducting | 3 meters stainless ducting and one chimney elbow | ||
Max heating temperature Heating time |
80degrees 4-6min(20-60degrees) |
||
fuel consumption | 5-6L /vehicle | ||
Lighting System | Ceiling lights | 8 Units, each 4 x 36W Philips lamps, Total 1152 W | |
Side lights | 8 Units, each 4 x 20W Philips lamps, Total 800 W | ||
Illumination | 1200LUX | ||
Controlling system | Switched control panel | Spraying & baking switch, lighting switch, emergency stop, breakdown alarm, failure alarm, pressure gauge |
Production Photos:
- Analysis Instrument
- Auto Repair Equipment & Tools
- Detector
- Medical Diagnosis Equipment
- Test Instrument
- Color Card & Color Comparator
- Geographic Surveying Instrument
- Meter for Liquid & Gas
- Physical Measuring Meter
- Weighing & Measuring Apparatus
- Optical Lens & Instrument
- Lab Utensil and Disposable
- Laboratory Instruments
- Beauty Equipment
- Demonstrational & Teaching Utensil
- Dental Apparatus
- Universal Medical Implement
- Other Instruments & Meters